Welcome to black opal
Shaping the Future with Design and Engineering
Black Opal Ltd is an autonomous firm providing a wide spectrum of professional services, including design, architecture, planning, engineering, environmental studies, and technical expertise.
View Projects
View Projects
View Projects
Kaberamaido
Steel structure and frabrication
Namutumba
Steel structure and frabrication
Lyantonde
Steel structure and frabrication
Kaberamaido
Steel structure and frabrication
Namutumba
Steel structure and frabrication
Lyantonde
Steel structure and frabrication
Kaberamaido
Steel structure and frabrication
Namutumba
Steel structure and frabrication
Lyantonde
Steel structure and frabrication
Kaberamaido
Steel structure and frabrication
Namutumba
Steel structure and frabrication
Lyantonde
Steel structure and frabrication
Kaberamaido
Steel structure and frabrication
Namutumba
Steel structure and frabrication
Lyantonde
Steel structure and frabrication
Kaberamaido
Steel structure and frabrication
Namutumba
Steel structure and frabrication
Lyantonde
Steel structure and frabrication
Kaberamaido
Steel structure and frabrication
Namutumba
Steel structure and frabrication
Lyantonde
Steel structure and frabrication
Kaberamaido
Steel structure and frabrication
Namutumba
Steel structure and frabrication
Lyantonde
Steel structure and frabrication
Welcome to black opal
Top-notch services
Environmental Services
Environmental Services
Environmental Services
Infrastrucure Management
Infrastrucure Management
Infrastrucure Management
Civil and Structural Engineering
Civil and Structural Engineering
Civil and Structural Engineering
Mechanical and Electrical Services
Mechanical and Electrical Services
Geotechnical Engineering
Geotechnical Engineering
Conceptual and
Detail Design
Conceptual and
Detail Design
See all services
See all services
See all services
Process
Check out our process
Discover the seamless journey from concept to completion. Our streamlined process ensures meticulous planning and execution, guaranteeing quality at every step.
01
Project Planning
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
02
Design Phase
Engage structural engineers and designers to create detailed plans and blueprints.
Consider factors such as load-bearing capacity, wind resistance, and material selection.
Obtain necessary approvals and permits from relevant authorities
03
Material Procurement
Source high-quality materials based on the approved design.
Ensure materials meet industry standards and specifications.
Coordinate deliveries to the fabrication site.
04
Documentation and Handover
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
05
Installation
Prepare the foundation or support structure at the installation site.
Assemble and erect the tower sections according to the design.
Securely anchor the tower to the foundation.
Conduct final inspections to ensure proper alignment and structural integrity.
06
Fabrication
Set up a fabrication area with the necessary equipment and safety measures.
Cut, shape, and assemble structural components according to the design.
Weld or join components securely to form the tower structure.
Conduct quality control checks throughout the fabrication process.
07
Testing and Commissoning
Conduct pressure tests to check for leaks and ensure water-tightness.
Test the tower's structural stability and load-bearing capacity.
Commission the water tank tower for regular operation.
01
Project Planning
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
02
Design Phase
Engage structural engineers and designers to create detailed plans and blueprints.
Consider factors such as load-bearing capacity, wind resistance, and material selection.
Obtain necessary approvals and permits from relevant authorities
03
Material Procurement
Source high-quality materials based on the approved design.
Ensure materials meet industry standards and specifications.
Coordinate deliveries to the fabrication site.
04
Documentation and Handover
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
05
Installation
Prepare the foundation or support structure at the installation site.
Assemble and erect the tower sections according to the design.
Securely anchor the tower to the foundation.
Conduct final inspections to ensure proper alignment and structural integrity.
06
Fabrication
Set up a fabrication area with the necessary equipment and safety measures.
Cut, shape, and assemble structural components according to the design.
Weld or join components securely to form the tower structure.
Conduct quality control checks throughout the fabrication process.
07
Testing and Commissoning
Conduct pressure tests to check for leaks and ensure water-tightness.
Test the tower's structural stability and load-bearing capacity.
Commission the water tank tower for regular operation.
01
Project Planning
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
02
Design Phase
Engage structural engineers and designers to create detailed plans and blueprints.
Consider factors such as load-bearing capacity, wind resistance, and material selection.
Obtain necessary approvals and permits from relevant authorities
03
Material Procurement
Source high-quality materials based on the approved design.
Ensure materials meet industry standards and specifications.
Coordinate deliveries to the fabrication site.
04
Documentation and Handover
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
05
Installation
Prepare the foundation or support structure at the installation site.
Assemble and erect the tower sections according to the design.
Securely anchor the tower to the foundation.
Conduct final inspections to ensure proper alignment and structural integrity.
06
Fabrication
Set up a fabrication area with the necessary equipment and safety measures.
Cut, shape, and assemble structural components according to the design.
Weld or join components securely to form the tower structure.
Conduct quality control checks throughout the fabrication process.
07
Testing and Commissoning
Conduct pressure tests to check for leaks and ensure water-tightness.
Test the tower's structural stability and load-bearing capacity.
Commission the water tank tower for regular operation.
01
Project Planning
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
02
Design Phase
Engage structural engineers and designers to create detailed plans and blueprints.
Consider factors such as load-bearing capacity, wind resistance, and material selection.
Obtain necessary approvals and permits from relevant authorities
03
Material Procurement
Source high-quality materials based on the approved design.
Ensure materials meet industry standards and specifications.
Coordinate deliveries to the fabrication site.
04
Documentation and Handover
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
05
Installation
Prepare the foundation or support structure at the installation site.
Assemble and erect the tower sections according to the design.
Securely anchor the tower to the foundation.
Conduct final inspections to ensure proper alignment and structural integrity.
06
Fabrication
Set up a fabrication area with the necessary equipment and safety measures.
Cut, shape, and assemble structural components according to the design.
Weld or join components securely to form the tower structure.
Conduct quality control checks throughout the fabrication process.
07
Testing and Commissoning
Conduct pressure tests to check for leaks and ensure water-tightness.
Test the tower's structural stability and load-bearing capacity.
Commission the water tank tower for regular operation.
01
Project Planning
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
02
Design Phase
Engage structural engineers and designers to create detailed plans and blueprints.
Consider factors such as load-bearing capacity, wind resistance, and material selection.
Obtain necessary approvals and permits from relevant authorities
03
Material Procurement
Source high-quality materials based on the approved design.
Ensure materials meet industry standards and specifications.
Coordinate deliveries to the fabrication site.
04
Documentation and Handover
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
05
Installation
Prepare the foundation or support structure at the installation site.
Assemble and erect the tower sections according to the design.
Securely anchor the tower to the foundation.
Conduct final inspections to ensure proper alignment and structural integrity.
06
Fabrication
Set up a fabrication area with the necessary equipment and safety measures.
Cut, shape, and assemble structural components according to the design.
Weld or join components securely to form the tower structure.
Conduct quality control checks throughout the fabrication process.
07
Testing and Commissoning
Conduct pressure tests to check for leaks and ensure water-tightness.
Test the tower's structural stability and load-bearing capacity.
Commission the water tank tower for regular operation.
01
Project Planning
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
02
Design Phase
Engage structural engineers and designers to create detailed plans and blueprints.
Consider factors such as load-bearing capacity, wind resistance, and material selection.
Obtain necessary approvals and permits from relevant authorities
03
Material Procurement
Source high-quality materials based on the approved design.
Ensure materials meet industry standards and specifications.
Coordinate deliveries to the fabrication site.
04
Documentation and Handover
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
05
Installation
Prepare the foundation or support structure at the installation site.
Assemble and erect the tower sections according to the design.
Securely anchor the tower to the foundation.
Conduct final inspections to ensure proper alignment and structural integrity.
06
Fabrication
Set up a fabrication area with the necessary equipment and safety measures.
Cut, shape, and assemble structural components according to the design.
Weld or join components securely to form the tower structure.
Conduct quality control checks throughout the fabrication process.
07
Testing and Commissoning
Conduct pressure tests to check for leaks and ensure water-tightness.
Test the tower's structural stability and load-bearing capacity.
Commission the water tank tower for regular operation.
01
Project Planning
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
02
Design Phase
Engage structural engineers and designers to create detailed plans and blueprints.
Consider factors such as load-bearing capacity, wind resistance, and material selection.
Obtain necessary approvals and permits from relevant authorities
03
Material Procurement
Source high-quality materials based on the approved design.
Ensure materials meet industry standards and specifications.
Coordinate deliveries to the fabrication site.
04
Documentation and Handover
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
05
Installation
Prepare the foundation or support structure at the installation site.
Assemble and erect the tower sections according to the design.
Securely anchor the tower to the foundation.
Conduct final inspections to ensure proper alignment and structural integrity.
06
Fabrication
Set up a fabrication area with the necessary equipment and safety measures.
Cut, shape, and assemble structural components according to the design.
Weld or join components securely to form the tower structure.
Conduct quality control checks throughout the fabrication process.
07
Testing and Commissoning
Conduct pressure tests to check for leaks and ensure water-tightness.
Test the tower's structural stability and load-bearing capacity.
Commission the water tank tower for regular operation.
01
Project Planning
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
02
Design Phase
Engage structural engineers and designers to create detailed plans and blueprints.
Consider factors such as load-bearing capacity, wind resistance, and material selection.
Obtain necessary approvals and permits from relevant authorities
03
Material Procurement
Source high-quality materials based on the approved design.
Ensure materials meet industry standards and specifications.
Coordinate deliveries to the fabrication site.
04
Documentation and Handover
Define project specifications, requirements, and objectives.
Determine the capacity and dimensions of the water tank tower.
Establish project timelines and budget
05
Installation
Prepare the foundation or support structure at the installation site.
Assemble and erect the tower sections according to the design.
Securely anchor the tower to the foundation.
Conduct final inspections to ensure proper alignment and structural integrity.
06
Fabrication
Set up a fabrication area with the necessary equipment and safety measures.
Cut, shape, and assemble structural components according to the design.
Weld or join components securely to form the tower structure.
Conduct quality control checks throughout the fabrication process.
07
Testing and Commissoning
Conduct pressure tests to check for leaks and ensure water-tightness.
Test the tower's structural stability and load-bearing capacity.
Commission the water tank tower for regular operation.
why choose us
what makes us different
Innovative Solutions
Our solutions boast ingenuity with a blend of functionality and aesthetic making all our projects a visible monument a work of extreme engineering.
30
Projects Completed
Skilled Expertise
We have a skilled and experience team of technical engineers with a total of 50 year of experience. Our teams are equipped with industry standard tools.
25
Projects Completed
get in touch with us
Get a quote for your upcoming project
Contact us
Contact us
Contact us
Black Opal Ltd is an autonomous firm providing a wide spectrum of engineering and design services
Contact Us
+256 782 253 226 +256 782 194 777
info@blackopalltd.com
Regus 4th Floor, Acacia mall Plot 1418 Cooper Road, Kololo
Black Opal Ltd is an autonomous firm providing a wide spectrum of engineering and design services
Contact Us
+256 782 253 226
+256 782 194 777
info@blackopalltd.com
Regus 4th Floor, Acacia mall Plot 1418 Cooper Road, Kololo
Black Opal Ltd is an autonomous firm providing a wide spectrum of engineering and design services